Scotland S&C Renewals 2008
11th March 2008
<-- Index | Showing 1-24 of 49 pictures | Next -->
S&C Renewals in Scotland by First Engineering following the transfer of the NR S&C installation contract from Jarvis (STRC) as part of "6 to 4".
In bearer clamp lock on Falkland 113b points
In bearer clamp lock on Falkland 113b points
In bearer clamp lock on Falkland 113a points
In bearer clamp lock on Falkland 113a points
Cutting tied bearers on 113a/b to convert to
Cutting tied bearers on 113a/b to convert to "Mk1" modular
Cutting tied bearers on 113a/b to convert to
Cutting tied bearers on 113a/b to convert to "Mk1" modular
Cutting tied bearers on 113a/b to convert to
Cutting tied bearers on 113a/b to convert to "Mk1" modular
Falkland: Tandem lifting 114a crossing panel 15-04-2008
Falkland: Tandem lifting 114a crossing panel 15-04-2008
Falkland: Tandem lifting 114a crossing panel 15-04-2008
Falkland: Tandem lifting 114a crossing panel 15-04-2008
Falkland: Bottom ballast being laid and graded 26-04-2008
Falkland: Bottom ballast being laid and graded 26-04-2008
Falkland: The SERSA RailVac RA2 26-04-2008
Falkland: The SERSA RailVac RA2 26-04-2008
Falkland: The business end of RA2 26-04-2008
Falkland: The business end of RA2 26-04-2008
Falkland: Tandem lifting 114b crossing panel with FELs Kirow 250s 26-04-2008
Falkland: Tandem lifting 114b crossing panel with FELs Kirow 250s 26-04-2008
Falkland: Lifting in a closure panel with the Kirow 250 26-04-2008
Falkland: Lifting in a closure panel with the Kirow 250 26-04-2008
Falkland: almost a joined up railway: 1830 on 26-04-2008
Falkland: almost a joined up railway: 1830 on 26-04-2008
Craiglochart J: a reballast only site in a tunnel: nae luck!
Craiglochart J: a reballast only site in a tunnel: nae luck!
The Sersa RailVac RA2 about to be offloaded in the Down Yard at Falkland
The Sersa RailVac RA2 about to be offloaded in the Down Yard at Falkland
Falkland 114a points one week after installation
Falkland 114a points one week after installation
Prestonpans 11-10-2008: coal train
Prestonpans 11-10-2008: coal train "trapped" in power station yard
Prestonpans 11-10-2008: grading bottom ballast for 43a-b points
Prestonpans 11-10-2008: grading bottom ballast for 43a-b points
Prestonpans 11-10-2008: the sign says it all!
Prestonpans 11-10-2008: the sign says it all!
Newbridge Junction 11-10-2008  Excavation / reballasting on the Up line in progress
Newbridge Junction 11-10-2008 Excavation / reballasting on the Up line in progress
Grantshouse North 25-10-08: waiting S&C panels
Grantshouse North 25-10-08: waiting S&C panels
Grantshouse 25-10-08: swichpanel tandem lift with Kirow 250UKs
Grantshouse 25-10-08: swichpanel tandem lift with Kirow 250UKs
A wet and windy Grantshouse: 25-10-08: 2 x Kirow 250UK cranes
A wet and windy Grantshouse: 25-10-08: 2 x Kirow 250UK cranes
Panelised S&C @ McPherson's sidings, Perth for Hilton Jn (23-12-2008)
Panelised S&C @ McPherson's sidings, Perth for Hilton Jn (23-12-2008)