Raith Farm freight termial site, Dyce |
Dyce loop: Inverness - Aberdeen coming off the single line |
2Z01 passes Raith Farm 28-03-07 |
2Z01 passes Raith Farm 28-03-07 |
Laying new half connection between Craiginches Up No2 loop and No 3 siding to form No3 up loop 20-04-2007 |
Laying new half connection between Craiginches Up No2 loop and No 3 siding to form No3 up loop 20-04-2007 |
Laying new half connection between Craiginches Up No2 loop and No 3 siding to form No3 up loop 20-04-2007 |
New half connection @ Craiginches Up yard |
Earthworks for REB and access track @ Raith Farm |
Internal track laying at Raith Farm: the line to the right is the aviation fuel siding. |
Trackwork 08-275 tamper at Raiths Farm |
Trackwork 08-275 tamper at Raiths Farm |
66076 at Inverurie on trip ballast |
Raiths Farm freight terminal |
Preparation work on main line at Dyce (new Up/Dn single line) @ 7mp |
New Up / Dn single line @ OB43 looking North |
New Up / Dn single line @ OB43 looking South |
New signal erected |
New and old signals at Dyce 1 |
New and old signals at Dyce 1 |
One giant step for the S&T! |
Dyce REB base takes shape |
New Up / Down single line takes shape |
New rounding line |
| | | |